A field checklist for drillers moving a rig from Gujarat to Rajasthan, from paperwork and lashing to the last kilometre of farm road.
Gujarat to Rajasthan is one of the lanes we run most for drillers. Groundwater work keeps rigs busy across Udaipur, Jodhpur, Barmer and beyond, and a lot of those rigs come up from Gujarat. Here is the checklist we go through on every move.
Before the trailer arrives
- Rig details. Model, weight and folded height. A side photo helps us confirm the trailer.
- Paperwork. Keep the rig’s ownership papers and invoice handy. For a new rig, the sale invoice and delivery documents.
- The full set. Decide whether the compressor, drill pipes and support truck are moving the same day. It changes the trailer plan.
- Site location. Send a location pin, not just the village name. Many drilling sites are a few kilometres off the main road.
On loading day
- Drain or secure anything that can leak or swing, especially hydraulic hoses.
- Fold the mast fully and make sure it sits on a padded support, never directly on the deck.
- Chain the rig at four points with ratchet binders.
- Strap the drill pipes together as one bundle so they cannot roll.
- Take a few photos of the loaded rig for your own records.
On the road
The climb after Shamlaji on the way to Udaipur is slow for heavy trailers, so we plan time for it instead of pushing through at night. Our drivers re-check every chain at each halt. On long runs to western Rajasthan we share updates from the road so you are not left guessing.
The last kilometre
This is where most delays happen. A long trailer cannot always reach a farm site down a narrow track. We talk to the driller before departure about the approach road. If the trailer cannot get close, we agree a safe drop point nearby and the rig drives the last stretch on its own tracks or wheels.
After unloading
Check the rig before the trailer leaves. Look at the mast, the hoses and the drill head. It takes ten minutes and gives everyone peace of mind.
Want us to plan yours?
Call us with the rig model, pickup and the site pin. We will tell you the trailer, the timing and one clear rate for the full move.